We are also specialized in panel assembly work and the installation of PCS & PSD System PLC-based instrument control panels and process control system panels in a Zone 2 Ex P'z' Purge Panel-certified enclosure. PETROBRAS P78, P80, P82 & P83 FPSO Project.
Design, engineering and fabricating the 48VDC Solar and Wind Hybrid Power System Timi Development Project
Assemble, Install and Commission SIS PLC Upgrade Project (RCC & CDU3 PLC) for PA1, PA2, PA3 & PA4 PLC based Emergency Shutdown Systems and PLC based Fire & Gas Systems. SRC System Upgrading Project
Assemble Rotork Actuator & Shutdown Valve (SDV) & Blowdown Valve (BDV) for Thien Ung Platform. Actuated Valves for Thien Ung Platform Project
Supplied and installed SDV for VSP GT1 & MT1 project GT1 & MT1 Project